A NIS 450 million tender was published which will include a 9 km travel route on Ayalon lanes
Posted on Oct 17, 2019 by Ifi Reporter
The Ministry of Transport and the Ayalon route company have published the tender for the work under the third section of the "Highways" project.
This is a NIS 450 million tender, which will include a 9 km travel route on Ayalon lanes: In Ayalon North in the section of the road from the JNF interchange to the Seven Star interchange a 4.5 km long lane will be added, and in Ayalon South a lane will be added from the seven star interchange to To a 4.5 km JNF interchange.
The works in the third section of the project include the addition of highways along Ayalon North and South. As part of the works, another route will be paved from the KKL-JNF interchange to the seven-star interchange in both directions, and two bridges will be built directly connecting the highway on Route 20 to the highway on Route 5.
This is a third of four, with work on the first section beginning in July this year and work on the second section starting in the coming months.
The highway project includes the construction of about 75 km of highways in the center of the country, along Ayalon, Road 5 and the coastal road. This is a route that will be added to existing routes today. In addition, 2 huge parking lots "Hanna & Rana" will be built, which will include a total of There are 11,000 parking spaces, so the car can be parked in the parking lot and traveled to the central areas of employment in Tel Aviv and the surrounding area by means of free shuttles that will be released frequently from 06:00 until 23:00 The project is expected to be completed in 2025.
Articles Archive
Top Categories
ABOUT IFI TODAY
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum